Currently Highland has set up pilot screening test work at mine site. To test recovery percentage and Mn grade of
float ore, which sit above the primary Mn bands. Approximately we have 100,000 square meter of surface area.
Estimated 800,000 tonne material feed for future process unit though the vibrator screens to recover previous Mn
material in soil. Based on previous and current test work it indicate potential to produce a minimum of 3 tipper
salable Mn material.